Families at the Benjamin Banneker Public Charter School got a sneak peek of the schoolโs new home, and its first permanent campus, Saturday morning at a ribbon-cutting ceremony.
The first day of school at the new location will be Monday, Nov. 30.

Banneker opened in 1996 in space rented from Reservoir Church on Notre Dame Avenue in North Cambridge. The new location, at 1 Matignon Road, will be the first campus the Banneker school has owned. The building was formerly home to Matignon High School, which closed in June 2023 due to financial challenges.
The Banneker school purchased the Matignon campus for $32 million in 2024.
โThe journey to this moment has not been easy, but seeing our students, families, staff, and supporters come together today reminded us why every challenge was worth overcoming,โ Sherley Bretous, Benjamin Bannekerโs executive director, said in a statement.
The Banneker school will share Matignon High Schoolโs former campus with the International School of Boston, which is in what were administrative offices and a convent.
Under one roof
The move to Matignon means the cafeteria, gymnasium and auditorium all have separate spaces in the same building. Previously, Banneker used a multipurpose room and other parts of campus for different activities.
The enthusiasm of teachers and Banneker staff at Saturdayโs event was evident.
Shawn Best, longtime physical education teacher at Banneker, said he is most excited to have a gymnasium that does not serve multiple purposes. โEverybody has a dedicated space thatโs their own,โ Best said, adding that the new building has โmore of that familyโ feel.
Amelia Fantasia, a second-grade teacher in her third year at Banneker, said it is nice to have a building โdedicated to us and dedicated to the kids.โ Latisha DuBose, another second-grade teacher who has taught at the school since 2014, said the building already feels like a โhome.โ
Library love

The library in its new building will also be a big upgrade, said Jennifer Gordon, a librarian at the Banneker school since 2001. She helped design the new space, which has a large welcome desk upon entering and opens up into a long room with tables and walls lined with books, giving it a more open feel.
โI had to really rethink and reconfigure everything to make it inclusive,โ Gordon said.
Families seeing the library for the first time on Saturday seemed delighted.
โThis is nice! I love it!โ one parent said upon entering. Some students ran up to Gordon with praise.
Other members of the Banneker community said they were most excited about the physical newness of the building in general. One parent said it felt โsqueaky clean.โ

When asked what is different about the new building, Anesta Hicks, a teacher at Banneker for 26 years, replied, โeverything.โ
Hicks teaches social studies and digital learning, including media literacy and artificial intelligence. Sheโll be based in the new buildingโs Anesta Hicks Digital Learning Studio, which is named for her.
The plaque for the studio reads: โMay this space encourage every student to imagine.โ
โI was very emotional,โ Hicks said about seeing the plaque. โThat’s an honor.โ
On a practical basis, sheโs looking forward to some upgrades. โInstead of having two printers, I get to have five,โ Hicks said. She added she is excited to be on the same floor with the art and music programs, which should increase collaboration.
High scores and close community
Banneker had an enrollment of 344 students last school year from preschool through sixth grade, with over half of its students classified as low-income, and 63% classified as โhigh needs.โ
The school community prides itself on a family atmosphere, and some of this was evident during Saturdayโs tour. Students ran up to favorite teachers and parents warmly greeted one another.
โItโs the Banneker,โ said Sean Rahim, the schoolโs facilities manager.

The independent public school has strong test scores and was ranked first in this yearโs U.S. News & World Report list of the top charter schools in Massachusetts, and fifth out of all elementary schools.
The school consistently outperforms statewide averages on the Massachusetts Comprehensive Assessment System. In the English Language Arts test last school year, 81% of students in grades three through eight met or exceeded grade-level expectations, vs. 40% statewide. In math, 87% of students met or exceeded expectations, vs. 41% at the state level.
Bretous said the new building โrepresents the next chapterโ of the schoolโs legacy, providing students with โthe space, resources, and opportunities they deserve.โ


